PLAN · SECTION · ELEVATION

Where should
the shower go?

Bath, shower, or room for both? Bathroom renovations for St Kilda apartments, terraces and flats — worked out as a layout first, then built.

SHEET A — PLAN

Three ways to plan
a narrow room

Most bathroom renovations in St Kilda start with a room that is long, tight or oddly shaped. Before choosing tiles, decide where the wet zone sits. These are the three layouts people ask about most.

▭ ◜ Layout 01

Bath across the end

Keeps the full width at the far wall for a bath, with vanity and toilet along one side. Works where the room is close to square at one end. Explore options with Bathroom Design.

▭ ▯ Layout 02

Walk-in shower along the length

A single glass panel instead of a hobbed enclosure lets a galley room read as one open space. See how we approach Walk-In Showers.

▭ ◠ Layout 03

Shower over bath

When a bath matters but floor space doesn’t allow both, one wet zone does two jobs. Common in apartments — read about Small Bathroom Renovations.

SHEET B — SECTION: THE WALL YOU WON’T SEE

Built in layers,
finished in tile

A good shower is decided behind the surface. Each layer depends on the one before it, so we plan them in order.

◇ Waterproofing — the membrane under every wet area

▦ Bathroom Tiling — falls, set-out and grout lines

◠ Shower Renovations — mixers, rose and niche

▯ Walk-In Showers — screen, drain and threshold

▭ Vanity Installation — wall fixing and plumbing

Modern bathroom featuring a glass-enclosed shower with tiled walls, freestanding bathtub, dark fixtures, blue vanity cabinetry, countertop basin and framed mirror.

Glass-enclosed shower on tiled walls — the finished face over the layers behind it

SCHEDULE — RENOVATION PROCESS

Four stages,
in order

Each stage depends on the one before it. More on the sequence in Bathroom Renovation Timelines.

▭ Stage 01

Design

Layout, fixtures and selections settled on paper. See Bathroom Design.

▯ Stage 02

Strip-out and rough-in

The old room comes out and plumbing and electrical are set to the new plan.

◇ Stage 03

Waterproofing and tiling

Membrane first, then floor and wall tile. See Waterproofing.

◠ Stage 04

Fit-off

Vanity, tapware, screens and accessories go in to finish the room.

Compact shower enclosure with dark stone-look wall tiles, a rain showerhead, handheld shower, recessed storage niche, and chrome controls.

Compact shower with a recessed niche in place of shelving

NOTES — SMALL ROOMS & ENSUITES

Small bathrooms,
clear decisions

In a compact bathroom every centimetre is a choice: a wall-hung vanity to show more floor, a recessed niche instead of shelving, one continuous tile across floor and wall.

Ensuites bring their own questions — ventilation, a door swing that clears the bed, and a finish that sits well with the bedroom beside it.

NOTES — WHY PLAN FIRST

Decided on paper,
not on site

St Kilda bathrooms are often long, narrow or oddly shaped, so every renovation is worked through as plan, section and elevation before work starts. Where the shower goes, what sits behind the tile and which finishes suit the room are settled early, while changes are still easy to make.

SHEET D — PROJECTS

Before and after,
on one sheet

Project case studies live on the Projects page, each set out the same way: suburb, bathroom type, brief, before and after photos, solution, materials and result.

REFERENCE — LATEST GUIDES

Read before
you plan

Short guides on the decisions that shape a bathroom before work begins.

Bathroom Renovation Cost Guide
What moves a budget: room size, layout changes, plumbing and finish level.

Small Bathroom Ideas
Layout swaps, wall-hung fixtures and niches that make a tight room work harder.

Bathroom Layouts Guide
Bath across the end, walk-in shower along the length, or shower over bath.

Bathroom Waterproofing Guide
How the membrane under the tile works, and the signs that it has failed.

SITE — SERVICE AREA

St Kilda first,
then close by

St Kilda VIC

St Kilda East · St Kilda West · Elwood · Balaclava · Windsor · Prahran · Albert Park · Middle Park

View service areas · Request a free quote

NOTES — QUESTIONS

Asked before
the first sketch

General answers to the questions that come up while a layout is still on paper. More in the Bathroom Renovation FAQ.

Can the shower move to a different part of the room?

Sometimes. It depends on where waste and water lines can run and what sits under the floor, so it is worked out on the plan before anything is ordered. See the Bathroom Layouts Guide.

Is waterproofing part of a bathroom renovation?

Yes. Wet areas get a membrane before any tile goes down, because tiles and grout alone don’t stop water. Read about Waterproofing.

Can a small bathroom have a walk-in shower?

Often, if the splash zone, drain and glass panel are placed with care. It’s one of the layouts compared for Small Bathroom Renovations.

What should I include in a quote enquiry?

Your suburb, the type of bathroom, a rough budget and timeframe, a short description of what isn’t working, and a few photos of the room. Start at Request a Free Quote.

ISSUE FOR QUOTE

Send us your room,
get a free quote

Tell us your suburb, bathroom type, budget and timeframe. Helpful photos: the whole room from the doorway, the shower or bath area, and any leaks or damaged tiles.