TICKET 09 — MAIN FOCUS: BATHROOMS

Bathrooms First: How I Plan a Bathroom Renovation

Bathrooms are the main focus of my work. I’m Ivan Bodnar, an independent sole trader and home renovation specialist in Melbourne, with about 15 years of hands-on experience in residential renovations. This page explains how I approach a bathroom: which decisions come first, what I take care of myself, and which parts licensed specialists handle. For the full service overview, see Bathroom Renovations in Melbourne.

CONDITION — DECIDE IN THIS ORDER

A  WHAT CONDITION IS IT IN?

B  REPAIR, UPDATE OR FULL RENOVATION?

C  DOES IT INVOLVE REGULATED WORK?

D  WHAT SURFACES AND FINISHES?

E  WHEN CAN IT HAPPEN?

Tiles and fittings come last. See the five decisions explained.

SCOPE — AT A GLANCE

What a bathroom job covers

You deal directly with me, from the first conversation to the finished work. I assess the bathroom, discuss the options, organise the work and take responsibility for the result.

☐ ASSESS
Site visit and property assessment, followed by a free quote.

☐ STRIP AND PREPARE
Removing old finishes and checking the surfaces underneath before anything new goes on.

☐ FINISH
Tiling, flooring, plasterboard, plastering and painting.

☐ COORDINATE
Plumbing, electrical and other regulated work, carried out by appropriately licensed specialists.

NOTE The right solution, estimated cost and timeframe depend on the property’s condition and the work required.

CONDITION — DECIDE IN THIS ORDER

Five decisions, in the right order

A common renovation mistake is focusing on the finished look without properly checking what’s underneath. In a bathroom, tiles and fittings are the last decision, not the first. Why I check what’s underneath.

A  WHAT CONDITION IS IT IN?
Cracked tiles, drummy floors or tired walls can point to something deeper. I look at the surfaces and the signs around them before suggesting a fix.

B  REPAIR, UPDATE OR FULL RENOVATION?
Some bathrooms only need repairs. Others need stripping back. I explain the options honestly, along with any difficulties I can see.

C  DOES IT INVOLVE REGULATED WORK?
Moving fixtures, changing plumbing or adding electrical points means licensed specialists, so that is worked out early.

D  WHAT SURFACES AND FINISHES?
Once the base is understood, choosing tiles, flooring and paint becomes a practical decision rather than a gamble.

E  WHEN CAN IT HAPPEN?
Timing depends on the scope and on specialist availability, so it’s agreed once the work is clear.

NEXT STEP — HOW A BATHROOM JOB RUNS

From first message to finished room

01

ENQUIRY

Describe the bathroom work, with your suburb and a few photos if you can. What to include.

02

SITE VISIT

I come out and assess the bathroom myself. The inspection is free.

03

QUOTE

A free quote based on what I found, including which parts need licensed specialists.

04

THE WORK

Once we’ve agreed the arrangements, I organise the job and stay your point of contact throughout.

LIMITS — WHO DOES WHAT

Where licensed specialists come in

I don’t personally do licensed plumbing or electrical work. When a bathroom renovation needs it, appropriately licensed specialists carry out those parts within their authorised scope.

Regulated building work may also call for suitably authorised specialists, and permit, registration and insurance requirements need to be assessed for each job. I raise this at the assessment stage so it doesn’t come as a surprise later.

I don’t offer a 24-hour emergency plumbing, electrical or gas service. Urgent requests and weekend work may be possible by prior arrangement, subject to availability. More detail: Working with Licensed Specialists.

QUERIES — BATHROOM WORK

Before you get in touch

More answers on the FAQ page.

Is the site visit and quote free?
Yes. The inspection and the quote are both free. Nothing is booked or confirmed through the website. We agree on arrangements once you’ve seen the quote. How the assessment works.

Who will I be dealing with?
Me. I’m the person who assesses the bathroom, discusses the options, organises the work and takes responsibility for the result.

How long will it take and what will it cost?
That depends on the bathroom’s condition and the work it needs, which is why I assess it first rather than guess.

My tiles are cracked. Is that a renovation?
Not always. Read My Tiles Are Cracked. What Now? or see Wall and Floor Tiling.

I’m available 9am to 5pm, seven days, on 0413 142 055, and I work across Melbourne and surrounding suburbs.